HDM-4 Version 2.10 Upgrade

HDM-4 Version 2.10 Upgrade is now available free to registered HDM-4 Version 2 licence holders by downloading from the HDMGlobal website. This upgrade introduces the possibility for users to use HDM-4 with the new HDM-Sentry software tool, as well as a number of other issues identified in HDM-4 Version 2 identified below.

1) CONCRETE RD & WE: The absolute concrete RD models did not always give reliable results unless the pavement was modelled from its construction year. This has been addressed by introducing Incremental Concrete Road Deterioration Models that better support the modelling of concrete pavements at any point within their lifecycle. These models were introduced in Version 2.09 update. This version of the software includes minor updates to these models following user feedback. (see KB0000101)

2) The Concrete Work Effects triggering and effects have been improved to support the incremental models and ensure work items trigger as expected.

3) COMAND LINE OPTIONS: Enhance command line options for HDM-4 to include the ability to: 

  • create a new workspace
  • open a specified workspace
  • import data from a pre-defined folder structure
  • run a specified analysis from the selected workspace

4) VEHICLE FLEETS: If a user updated the number of axles and then clicked on the "Calculate ESAL" button, the data just entered by the user was not used in the calculator. This issue has been resolved.

5) IMPROVEMENT STANDARDS: In certain circumstances, it was possible for the after works CBR to be set to 0. This resulted in errors in the calculation of the pavement strength. This error also affected the calculation of other parameters resulting in incorrect IRI values.

6) PROGRAMME ANALYSIS: If the user selected the muti-year forward programming option in-year pothole patching works were not always being triggered. This has now been corrected.

7) STRATEGY ANALYSIS: If a user created a new strategy analysis and then renamed, or copied the new strategy, any changes made to the original strategy analysis were lost. This has now been corrected.

8) PROGRAMME ANALYSIS: If a user created a new programme analysis and then renamed, or copied the new strategy, any changes made to the original programme analysis were lost. This has now been corrected.

9) IMPROVEMENT STANDARD: If a section was upgraded from a bituminous to concrete road, the average roughness was incorrectly reported in the first year after upgrading. This has now been corrected.

10) IMPROVEMENT STANDARD: When upgrading from an unsealed road to a bituminous road, the CBR value was not being retained so when certain work items were applied the after works pavement strength was not being calculated correctly. This has now been corrected.

11) SPEED FLOW TYPES: When copying an existing speed flow type, a new item was created but the original's values were overwritten by the default values. This error has been corrected.

12) REPORTS: New graphical reports for concrete pavements have been introduced. (see KB0000101)

  • Technical Support

    Technical Support

    Find out about the technical support service offered by HDMGlobal to help users use HDM-4 effectively.

  • Knowledge Base

    Knowledge Base

    View articles that address common questions received by HDM-4 Support.

  • Software Updates

    Software Updates

    For existing HDM-4 users, view the latest software release and the changes made before registering to receive the updates.